SANTOS, M.D.S.TOLEDO, P.S.LIMA, F.W.PIERONI, R.R.CARDWELL, C.C.ABRAO, A.BRENNER, P.CYBULSKA, E.W.PEREIRA, C.R.NASCIMENTO, I.C.PENTEADO, A.C.WILNER, E.FRANSCINO, A.R.2015-11-062015-11-062015-11-062015-11-061958SANTOS, M.D.S.; TOLEDO, P.S.; LIMA, F.W.; PIERONI, R.R.; CARDWELL, C.C.; ABRAO, A.; BRENNER, P.; CYBULSKA, E.W.; PEREIRA, C.R.; NASCIMENTO, I.C.; PENTEADO, A.C.; WILNER, E.; FRANSCINO, A.R. Preliminary results of 5Mw operation with the brazilian swimming pool reactor. (IEA-PUB-13). Disponível em: http://repositorio.ipen.br/handle/123456789/24088.http://repositorio.ipen.br/handle/123456789/24088openAccessbraziliear-1 reactorradiation monitoringreactor coresreactor operationPreliminary results of 5Mw operation with the brazilian swimming pool reactorSérie Publicação IPEN