Comissioning of the IEA-R1 nuclear reactor new heat exchanger
Carregando...
Data
Data de publicação:
2017
Orientador
Título da Revista
ISSN da Revista
Título do Volume
É parte de
É parte de
É parte de
É parte de
60 YEARS OF IEA-R1: INTERNATIONAL WORKSHOP ON UTILIZATION OF RESEARCH REACTORS
Resumo
This work presents results on the commissioning of the new heat exchanger of
the IEA-R1 nuclear reactor in the occasion of its operational power upgrade from 2
MW to 5 MW, in comparison to the values calculated in the project of IESA Design
and Equipments Company. This reactor is a swimming pool type, light water
moderated and with graphite reflectors, used for research purposes and medical radioisotopes
production. During monitoring procedures, issues were observed on the
reactor operation at 5 MW mainly due to the ageing of the reactor’s oldest heat
exchanger (TC-A) and excessive vibrations at high flow rates on the other installed
heat exchanger (TC-B). So it was decided to provide a new IESA heat exchanger
with 5 MW capacity to definitely substitute the TC-A heat exchanger. The results
show that the IEA-R1 nuclear reactor can be operated safely and continuously at 5
MW with the new IESA heat exchanger.
Como referenciar
CASTRO, A.J.A. de; UMBEHAUN, P.E.; CARVALHO, M.R. Comissioning of the IEA-R1 nuclear reactor new heat exchanger. In: 60 YEARS OF IEA-R1: INTERNATIONAL WORKSHOP ON UTILIZATION OF RESEARCH REACTORS, November 28 - December 01, 2017, São Paulo, SP. Abstract... São Paulo, SP: Instituto de Pesquisas Energéticas e Nucleares, 2017. p. 57-57. Disponível em: http://repositorio.ipen.br/handle/123456789/28754. Acesso em: 12 May 2024.
Esta referência é gerada automaticamente de acordo com as normas do estilo IPEN/SP (ABNT NBR 6023) e recomenda-se uma verificação final e ajustes caso necessário.