FRANCISCO MARIO FEIJO VASQUES

Projetos de Pesquisa
Unidades Organizacionais
Cargo

Resultados de Busca

Agora exibindo 1 - 4 de 4
  • Artigo IPEN-doc 24430
    Programa de radioproteção aplicado aos indivíduos ocupacionalmente expostos na usina piloto do IPEN-CNEN/SP na década de 80 para compostos de urânio natural
    2017 - SILVA, TERESINHA de M. da; SORDI, GIAN M.A.A.; VASQUES, FRANCISCO M.F.
    Este trabalho evidencia o processamento químico do urânio natural desde a fase “yellowcake” até a produção de hexafluoreto de urânio UF6 natural, processo este realizado na usina piloto do IPEN-CNEN/SP .O gerenciamento de radioproteção tinha por atividades monitorar os indivíduos ocupacionalmente expostos IOEs, o local de trabalho e meio ambiente. Por esta razão desenvolveu-se um programa de monitoração individual para o IOE tanto para irradiações externas quanto para incorporação do material radioativo. Os IOEs eram monitorados externamente com dosímetros tipo filme e internamente aplicou-se o método in vitro para análise de urina. Para o local de trabalho desenvolveu-se o programa de monitoração para equipamentos e pisos determinando a taxa de exposição proveniente dos equipamentos de processo, contaminação superficial expressa em Bq.cm-2 em equipamentos e pisos, complementando com o programa de monitoração do ar tanto para o trabalhador como para o local de trabalho .Utilizou-se filtros de celulose com diâmetro aerodinâmico de 0,3 micra até 8,0 micra.
  • Artigo IPEN-doc 23509
    Decommissioning of uranium pilot plants at IPEN-CNEN/SP: facilities dismantling, decontamination and reuse as new laboratories for strategic programs
    2016 - LAINETTI, PAULO E. de O.; FREITAS, ANTONIO A. de; VASQUES, FRANCISCO M.F.; FERREIRA, ROBSON de J.; COTRIM, MARYCEL E.B.; PIRES, MARIA A.F.
    From beginning of 90’s, the Brazilian nuclear policy has been changed radically. This determined the interruption of most R&D fuel cycle activities and the facilities shutdown at Nuclear and Energetic Research Institute (IPEN). The existence of those facilities also implicated in the need of constant surveillance, representing additional obligations, costs and problems. The reasons to promote the dismantling of the IPEN’s Nuclear Fuel Cycle Pilot Plants elapsed mainly from the need of physical space for new activities, since the R&D in the nuclear fuel cycle area were interrupted. In the last decade, IPEN has changed its “nuclear profile” to a “comprehensive and multidisciplinary profile”. With the end of most nuclear fuel cycle activities, the former facilities were distributed in four different centers. Each center has adopted a different strategy and priority to face the D&D problem. The available resources depend on the specific program in each area’s development (resources available from other sources, not only from Brazilian National Nuclear Energy Commission (CNEN). One of those new activities is the IPEN’s Environmental Program. This paper describes the procedures, problems faced and results related to the reintegration of the former pilot plant areas as new laboratories of the Chemical and Environmental Technology CenterCQMA of the IPEN.
  • Artigo IPEN-doc 08724
    Descontaminacao de superficies na Usina de Uranio Metalico da Divisao de Processos Metalurgicos IPEN/CNEN-SP
    2002 - CAMBISES, P.B.S.; ALMEIDA, C.C.; VASQUES, F.M.F.; SILVA, T.M.; MITAKE, M.B.; RODRIGUES, D.L.
  • Artigo IPEN-doc 08489
    Radiological survey of a Uranium Pilot Plant for rebuilding purpose
    2000 - KODAMA, Y.; VASQUES, F.M.F.; ALMEIDA, C.C.; CAMBISES, P.B.S.